Search  
 
Home Products & Services Market Sectors Projects About Careers

AMOG awarded riser and umbilical verification role by INPEX on the Ichthys LNG project

The Ichthys LNG Project is a Joint Venture between INPEX (76%, the Operator) and Total (24%). Gas from the Ichthys Field, in the Browse Basin approximately 200 kilometres offshore Western Australia, will undergo preliminary processing offshore to remove water and extract condensate. The gas will then be exported to onshore processing facilities in Darwin via an 889-kilometer subsea pipeline. The Ichthys LNG Project is expected to produce 8.4 million tonnes of LNG and 1.6 million tonnes of LPG per annum, along with approximately 100,000 barrels of condensate per day at peak.

AMOG’s role includes global modelling and verification of the flexible risers and umbilicals from separate dynamic systems including the Semi-Submersible Central Processing Facility (CPF) and the floating production, storage and offtake (FPSO) facility.

For more information, please contact AMOG.



Contact Us
Request a free consultation with an Engineer with the following methods.

Contact us via Email

Contact our Offices:
Melbourne - Adelaide - Perth - Houston

 

Mailing List
Join our mailing list.

Name  
Email
Industry  
Join  Privacy Policy
 

Latest News RSS News Feeds